
Roof Replacement
Complete Roof Installation
A complete roof installation, from a fully stripped deck through the finished roof.
Project Snapshot
Service
Roof Replacement
Roof Material
Asphalt Shingle
Before & After
See The Difference

What This Project Involved
This project covers a complete roof installation on a fully stripped deck. The photos show the bare deck, the installation in progress, and the finished roof.
What Homeowners Can Learn
From This Project
Starting from a fully stripped deck gives the clearest possible view of what's being built on, with nothing hidden underneath old material.
A complete installation follows a specific sequence: deck check, underlayment, flashing, then the field shingles, in that order.
Roof Care
Why The Roof Deck Matters
Everything about a roofing system depends on the deck underneath it being sound. A fully stripped deck lets that condition be confirmed directly, rather than assumed.
Any soft spots, rot, or damage found at this stage get addressed before installation continues, not discovered later as a leak.
What We Look For
What We Look At Before Installation
Deck condition
Confirming the deck is solid and properly fastened before anything new goes on top of it.
Flashing and penetrations
Planning flashing details at valleys, vents, and other penetrations before shingles go down.
Ventilation
Making sure the roof and attic can ventilate properly once the new system is complete.
Manufacturer specifications
Following the shingle manufacturer's installation requirements, which is also what keeps any material warranty valid.
Next Project

Ready To Talk About Your Roof?
Free estimates for homeowners across King County, Snohomish County, and Skagit County.
24-Hour Service · Financing Available

